Malsua 1,422 Posted November 9, 2019 Canistear will be closed from 23 to Cliffwood Lake tomorrow from 8am to 4pm for milling. To get to Cherry Ridge, you need to continue north on 23 to 515, go 6 miles to 638, 2.5 miles turn right on Breakneck down to Canistear and come in from that direction. 1 Quote Share this post Link to post Share on other sites